Telecoms • Power • Signalling • Civils

  • Design
  • Install
  • Test
  • Commission
  • Training
  • Resources •

LNE 650v Signalling Power Distribution Renewals

As a two-phase project undertaken within a challenging, high-theft area, Linbrooke were selected to replace the aged and deteriorated signalling lineside feeder systems at Healey Mills and Leeds East sections. This involved carrying out detailed design to provide suitable locations for new equipment. Read More