Telecoms • Power • Signalling • Civils

  • Design
  • Install
  • Test
  • Commission
  • Training
  • Resources •

Urbanwind

urbanwind-150-x-150Working in collaboration with the local authority, Linbrooke ensured the laying of 3km of HV cable from the customer’s wind turbine to a point of connection on SPEN’s overhead line network. Read More