Acting as an NERS accredited ICP provider we were appointed to provide the survey, design & installation of 6 rapid EV charge points in Brigg Garden Centre and The College Pub in Wakefield.
Brigg Garden Centre
Design, installation & testing of 3 Tritium Charge Points & LV distribution board to BS7671
Electrical infrastructure for one 240kVA three phase supply to supply 3 Tritium charge points, including all off site civils and reinstatement, installation of 40m of 3c 300mm mains cable and associated jointing and termination into a 400A heavy duty cut out.
All onsite and off site civils including feeder pillar base, 3 x car charging base, bollard installation,
signage installation and all trenching from feeder pillar to charge points.
Wakefield, The College Pub
As above, with 145m of 3c 300mm mains cable installed
Download Case Study - Brigg Garden Centre
Download Case Study - Wakefield, The College Pub