EV Charge Points Installation

Acting as an NERS accredited ICP provider we were appointed to provide the survey, design & installation of 6 rapid EV charge points in Brigg Garden Centre and The College Pub in Wakefield. 

Project Overview

Brigg Garden Centre
Design, installation & testing of 3 Tritium Charge Points & LV distribution board to BS7671

Electrical infrastructure for one 240kVA three phase supply to supply 3 Tritium charge points, including all off site civils and reinstatement, installation of 40m of 3c 300mm mains cable and associated jointing and termination into a 400A heavy duty cut out.

All onsite and off site civils including feeder pillar base, 3 x car charging base, bollard installation,
signage installation and all trenching from feeder pillar to charge points.

Wakefield, The College Pub 
As above, with 145m of 3c 300mm mains cable installed 

Download Case Study - Brigg Garden Centre 
Download Case Study - Wakefield, The College Pub 
Download Case Study - Wombwell Retail Park 

highlight
Highlights

Rapid Charge Points Installation

"Linbrooke provide a smooth process from start to finish, frequently going above and beyond to help us deliver sites efficiently and to a high standard. They are particularly proactive with resolving on-site issues."

Lydia Macdonell
Project Manager
Osprey Charging Network

QUICK FACTS:

location
Brigg & Wakefield
2 Weeks 
solutions
Reduced CO2 Emissions

Benefits Of Working With #Linbrooke

We offer a dynamic approach to every project finding the best and most cost-effective solutions with the aim to exceed our clients' expectations. Our unique business model provides comprehensive project management with a progressive approach to technology and innovation. We have a reputation for challenging traditional thinking and providing optimised project delivery.

Featured
Case Studies

Browse our case studies to learn more about the solutions we have provided for our customers.
View all case studies
crosschevron-right