Cable Engineering Services Framework
In an evolving energy industry Northern Powergrid plays a key role in creating and managing future energy systems that increasingly interact with customers and smart and low carbon technologies.
Since 2016 Linbrooke has been delivering cable asset replacement, reinforcement and removal works, restoration and repairs activities & customer driven new connections to domestic and commercial properties on behalf of Northern Powergrid.
Project Overview
Customer service interfacing across South and West Yorkshire to LV and HV cables up to 11kV: asset construction, replacement, reinforcement and removal works, restoration and repair activities & customer driven connections.
Asset: annually, over 60km network main cable overlays, including service transfers to
strengthen the existing network and c. 200 link boxes added and/or replaced in network.
Faults: annually, complete 100 out of hours LV/HV Fault repairs and cut out changes on LV & Hv Faults. 1000 Service / Main cable repairs, c. 150 Cut Out changes and over 200 fuse replacements and over 1300 faults fixed.
Connections: annually, complete over 2000 New Connections, 30km of main and service cable installed in 3rd party ducts / trenches.